Multimedia House Listings

December 27, 2008

Bulleted List of the 100K LEED Checklist Targets

In preparation for our exposed house this weekend , I made a speedy document with a bulleted list of all of the LEED for Homes points we are plumping after to attain LEED Platinum in the 100K House. It is introductory, but I reckoned I’d put up it hither since we haven’t spoken of the checklist in a while. Feel free to require questions in the comments and I’ll render to direct them as best I can.

ID Innovation and Design Process - 7 Points

  1. Desegregated Project Team 1
  2. Design Charrette 1
  3. 3rd Party Durability Management Verification 3
  4. Advanced Design Credits
  • Education & Awareness - Plumping supra & beyond reqs 1
  • Electricity monitor / phantom load prevention system 1

LL Location and Linkages - 10 Points

  1. Site Selection 2
  2. Opted Locations
    • Infill lot 2
    • Antecedently Produced 1
  3. Surviving Infrastructure 1
  4. Prominent Community Resources / Transit 3
  5. Access to Heart-to-heart Space 1
SS Sustainable Sites - 19.5 Points

  1. Minimise Distressed Area of Site 1
  2. Canonic Landscaping Design 2
  3. Throttle Established Turf 3
  4. Drought Tolerant Plants 2
  5. Shrink Local Heat Island Effects 1
  6. 100% Permeable Lot 4
  7. Lasting Erosion Controls 1
  8. Pest Control Alternatives 1.5
  9. Very Gamey Density Development 4

WE Water Efficiency - 6 Points

  1. Very Gamy Efficiency Fixtures & Fittings 6

EA Energy and Atmosphere - 23 Points

  1. Surpassing Energy Performance (HERS) 23
  2. Effective Red-hot Water Distribution 2
  3. Pipe Insulation 1
  4. Appropriate HVAC Refrigerants 1

MR Materials and Resources - 9.5 Points

  1. Off-site SIP Fabrication 4
  2. Environmentally Preferred Products 4.5
  3. Construction Waste Reduction 1

EQ Indoor Environmental Quality - 13 Points

  1. Heightened Combustion Airing Measures 2
  2. Raised Out-of-door Air Ventilation 2
  3. 3rd Party Performance Testing 2
  4. Heightened Local Exhaust 1
  5. Best Air Filters (MERV 12) 1
  6. Indoor Contaminant Control During Construction 1
  7. Preoccupancy Flush 1
  8. No Garage 3

AE Awareness and Education - 2 Points

  1. Raised Training 1
  2. Public Awareness 1

94 Total Points Targeted
136 Total Points Potential
83.5 Points Requisite for Platinum (based on our home size)



Related Posts:
Money To Burn

Filed under: Sell House — admin @ 12:51 pm

No Comments »

No comments yet.

RSS feed for comments on this post. TrackBack URI

Leave a comment

Enter the following characters/numbers into the box below, please!
Sample verification

Powered by WordPress